fbpx Skip to main content

Summit Design + Build Celebrates Two Years & A New Office In Downtown Tampa

Just over two years ago, general contractor Summit Design + Build opened a regional office in Tampa, Florida, expanding for the first time outside of their Chicago headquarters.

“Opening the Tampa office was something I wanted to do for some time,” said Adam Miller, President of Summit Design + Build. “I have strong ties to the area and it felt like the natural next step to expand our operations.”

The firm’s decision to make Tampa their second home was very intentional, and not just because of Miller’s existing connections to the area. Summit had been at the forefront of changing neighborhoods and landscapes before, and Tampa’s potential mirrored what they had experienced in Chicago’s Fulton Market. And despite being the new builder in town, their reputation as complex construction experts and their depth of experience means they offer their clients a fresh approach and out-of-the-box solutions.

Ocean Pointe • Summits Inaugural Project

Nearly 95 percent of the units at Ocean Pointe suffered major water damage during the storm and the task of rebuilding proved to be more difficult than expected.

“The damage was devastating,” recalled Hutchison. “A major problem was not having power restored for weeks. Smart, immediate solutions were vital.”

Over the course of the year-long reconstruction, Summit managed the remediation of 248 condo units and suites in five separate buildings, the construction of an all new marina, clubhouse and guard shack, and new landscaping.

Walk On’s Bistreaux 

Since the inaugural project, Summit has completed the reconstruction of an industrial warehouse in Tampa, the build-out of a 16,000 square foot store for retailer H&M, the build-out of new office suites for Office Evolution, the renovation of the Palms Plaza retail center in South Tampa, and the new construction of Florida’s first Walk On’s Bistreaux and Bar in Lutz, FL.

Beyond their unique offering, Summit recognizes the value of relationships in the construction industry.

“It’s an exciting time for us,” expressed Miller. “By having an office in Tampa, we’ve been able to help our clients enter the market as well. They see the promise of this area as much as we do.”

WeWork Tampa 

Longtime client WeWork has retained Summit to complete the build-out of their first Tampa location which spans three full floors at 501 East Kennedy. Summit also recently completed the build-out of a new office for Frank Recruitment Group at the 501 East Kennedy building and has started the adaptive reuse of an existing commercial building at 2151 Central in St. Petersburg.

The New Summit Design + Build Office

Summit shows no signs of slowing down as they plan to evolve and grow alongside the area and their clients. The firm has welcomed six new team members and recently moved into a 3,100 sq. ft. office space in the Wells Fargo Center in downtown Tampa. This move will allow Summit to better serve our clients and projects while providing us with sufficient space to accommodate our rapid growth.

Featured Florida Projects

Alessi Bakery

Tampa, FL

Studio Three

Miami, FL

Taverna Toscana

Bradenton, FL

Baresco

Pompano Beach, FL

Powerhouse Gym

Miami, FL

The Ponte

Tampa, FL

FSU Student Housing

Tallahassee, FL

William Dean Chocolates

Tampa, FL

Jeremiah Italian Ice

Bradenton, FL

Tampa Warehouse

Tampa, FL

Billy Bricks Wood Fired Pizza

Clearwater, FL

WeWork Place – 16th Floor

Chicago, IL

Palms Plaza

Tampa, FL

Frank Recruitment Group

Tampa, FL

WeWork Tampa Sitting Area

WeWork Place

Tampa, FL

2151 Central Avenue

St. Petersburg, FL

Walk On’s Bistreaux & Bar

Lutz, FL

Ocean Pointe Suites

Tavernier, FL